Workorder |
YGV12 |
Priority |
Fast Turn Double Sided |
Process |
Archive |
Cam |
|
Company Name |
ALPHA METALS |
Due Date |
5/07/14 |
Part Number |
PBGA928HIPTEST |
Number of Boards/Panel |
|
Number of Panels Made |
4 |
Number of Boards Ordered |
4 |
Number of Layers |
1 |
Panel Thickness |
|
Project Manager |
|
Sales Contact |
|
Shoporder |
S4020 |
Panel Size |
18X24 |
Total Job Value |
0.00 |
Value Per Board |
0.00 |
Notes |
LPI EXPERIMENT - SPRAY! |
Material |
|
PEP mean |
|
PEP Operator |
|
PEP date |
|
DC Plating rack |
|
DC Plating Date |
|
DC Plating cell(s) |
|
DC Plating Area Top |
|
DC Plating Area Bottom |
|
DC Plating spec |
|
DC Plating operator |
|
DC Plating Minimum Cu Deposit |
|
DC Plating Maximum Cu Deposit |
|
DC Notes |
|
Minimum Hole Diameter |
|
Pluritec Operator |
|
Pluritec Date |
|
Plurietc X comp |
|
Pluritec Y comp |
|
Outer Print Date |
|
Layer |
|
Standard Deviation |
|
Mean Registration |
|
Outer Layer Etch Operator |
|
Outer Layer Etch Date |
|
Trace Width Before Outer Layer Etch |
|
Trace Width After Tin Strip |
|
Cu Thickness at Outer Layer Etch |
|
Did panels need splashed? |
|
Line Speed of Outer Layer Etch |
|
Tin Strip Date |
|
Tin Strip Operator |
|
HAL Date |
|
HAL Operator |
|
HAL Bake Time |
|
HAL Time Since Last Baked |
|
HAL Air Knife Gap |
|
HAL Double Flux |
|
HAL Double Dip |
|
HAL Dwell Time |
|
HAL Air Knife Pressure Front |
|
HAL Air Knife Pressure Rear |
|
HAL Withdrawal Turns |
|
HAL Gold Fingers |
|
HAL Cold Press |
|
HAL Notes |
|
PPG Date |
|
PPG Operator |
|
PPG Run Speed |
|
PPG Step Tab |
|
PPG No. Of Panels |
|
PPG Stripper Date |
|
PPG Stripper Operator |
|
PPG Stripper No. Of Panels |
|
AOI Before Etch Start Time |
|
AOI Before Etch Stop Time |
|
AOI Before Etch Run Time |
|
Touch Up Start Time |
|
Touch Up Stop Time |
|
Touch Up Run Time |
|
AOI After Etch Start Time |
|
AOI After Etch Stop Time |
|
AOI After Etch Run Time |
|
Repair Inners Start Time |
|
Repair Inners Stop Time |
|
Repair Inners Run Time |
|
AOI Before Plating Start Time |
|
AOI Before Plating Stop Time |
|
AOI Before Plating Run Time |
|
AOI Final Start Time |
|
AOI Final Stop Time |
|
AOI Final Run Time |
|
Repair Outers Start Time |
|
Repair Outers Stop Time |
|
Repair Outers Run Time |
|
Job Start Date |
|
Job End Date |
|
Days to Complete |
|
On-Time Delivery Ratio |
|
Ship Date |
|
Original Milestones |
|
Process Milestones |
|
Bake Time |
|
Date Ship Date |
|