Workorder |
YGV02 |
Priority |
Normal Turn Multi-Layer |
Process |
Archive |
Cam |
|
Company Name |
COMP-X |
Due Date |
9/01/14 |
Part Number |
6923-3368-05B2 |
Number of Boards/Panel |
1 |
Number of Panels Made |
8 |
Number of Boards Ordered |
6 |
Number of Layers |
20 |
Panel Thickness |
.075 |
Project Manager |
|
Sales Contact |
|
Shoporder |
|
Panel Size |
18X12 |
Total Job Value |
18,000.00 |
Value Per Board |
3,000.00 |
Notes |
CC-PTH-FLASH-PTH-DRILL-PTH-FLASH-PTH-SNPB-GOLD-LPI-L-ROUTE-TEST |
Material |
|
PEP mean |
1.76 |
PEP Operator |
Adrian Smith |
PEP date |
2014-06-12 11:12:25.0 |
DC Plating rack |
|
DC Plating Date |
|
DC Plating cell(s) |
|
DC Plating Area Top |
|
DC Plating Area Bottom |
|
DC Plating spec |
|
DC Plating operator |
|
DC Plating Minimum Cu Deposit |
|
DC Plating Maximum Cu Deposit |
|
DC Notes |
|
Minimum Hole Diameter |
|
Pluritec Operator |
Scott Zaboski |
Pluritec Date |
2014-06-19 21:27:52.0 |
Plurietc X comp |
.0011 |
Pluritec Y comp |
.0022 |
Outer Print Date |
|
Layer |
|
Standard Deviation |
|
Mean Registration |
|
Outer Layer Etch Operator |
|
Outer Layer Etch Date |
|
Trace Width Before Outer Layer Etch |
|
Trace Width After Tin Strip |
|
Cu Thickness at Outer Layer Etch |
|
Did panels need splashed? |
|
Line Speed of Outer Layer Etch |
|
Tin Strip Date |
|
Tin Strip Operator |
|
HAL Date |
|
HAL Operator |
|
HAL Bake Time |
|
HAL Time Since Last Baked |
|
HAL Air Knife Gap |
|
HAL Double Flux |
|
HAL Double Dip |
|
HAL Dwell Time |
|
HAL Air Knife Pressure Front |
|
HAL Air Knife Pressure Rear |
|
HAL Withdrawal Turns |
|
HAL Gold Fingers |
|
HAL Cold Press |
|
HAL Notes |
|
PPG Date |
|
PPG Operator |
|
PPG Run Speed |
|
PPG Step Tab |
|
PPG No. Of Panels |
|
PPG Stripper Date |
|
PPG Stripper Operator |
|
PPG Stripper No. Of Panels |
|
AOI Before Etch Start Time |
|
AOI Before Etch Stop Time |
|
AOI Before Etch Run Time |
|
Touch Up Start Time |
|
Touch Up Stop Time |
|
Touch Up Run Time |
|
AOI After Etch Start Time |
|
AOI After Etch Stop Time |
|
AOI After Etch Run Time |
|
Repair Inners Start Time |
|
Repair Inners Stop Time |
|
Repair Inners Run Time |
|
AOI Before Plating Start Time |
|
AOI Before Plating Stop Time |
|
AOI Before Plating Run Time |
|
AOI Final Start Time |
|
AOI Final Stop Time |
|
AOI Final Run Time |
|
Repair Outers Start Time |
|
Repair Outers Stop Time |
|
Repair Outers Run Time |
|
Job Start Date |
|
Job End Date |
|
Days to Complete |
|
On-Time Delivery Ratio |
|
Ship Date |
|
Original Milestones |
|
Process Milestones |
|
Bake Time |
|
Date Ship Date |
|