Show Job

Workorder YDG52 Priority Fast Turn Multi-Layer
Process Archive Cam
Company Name BECTON-X Due Date 3/7/14
Part Number 13500084 Number of Boards/Panel 2
Number of Panels Made 12 Number of Boards Ordered 12
Number of Layers 8 Panel Thickness .125
Project Manager OC Sales Contact LS
Shoporder H4239 Panel Size 24X21
Total Job Value 2724.00 Value Per Board 227.00
Notes CC-DRILL-PTH-PATTERN-SNPB-LPI-L-ENIG-REX-TEST Material
PEP mean -8.24 PEP Operator Cindy Stemmler
PEP date 2014-03-10 19:09:01.0 DC Plating rack
DC Plating Date DC Plating cell(s)
DC Plating Area Top DC Plating Area Bottom
DC Plating spec DC Plating operator
DC Plating Minimum Cu Deposit DC Plating Maximum Cu Deposit
DC Notes Minimum Hole Diameter
Pluritec Operator Pluritec Date
Plurietc X comp Pluritec Y comp
Outer Print Date Layer
Standard Deviation Mean Registration
Outer Layer Etch Operator Outer Layer Etch Date
Trace Width Before Outer Layer Etch Trace Width After Tin Strip
Cu Thickness at Outer Layer Etch Did panels need splashed?
Line Speed of Outer Layer Etch
Tin Strip Date Tin Strip Operator
HAL Date HAL Operator
HAL Bake Time HAL Time Since Last Baked
HAL Air Knife Gap HAL Double Flux
HAL Double Dip HAL Dwell Time
HAL Air Knife Pressure Front HAL Air Knife Pressure Rear
HAL Withdrawal Turns HAL Gold Fingers
HAL Cold Press HAL Notes
PPG Date PPG Operator
PPG Run Speed PPG Step Tab
PPG No. Of Panels PPG Stripper Date
PPG Stripper Operator PPG Stripper No. Of Panels
AOI Before Etch Start Time AOI Before Etch Stop Time
AOI Before Etch Run Time Touch Up Start Time
Touch Up Stop Time Touch Up Run Time
AOI After Etch Start Time AOI After Etch Stop Time
AOI After Etch Run Time Repair Inners Start Time
Repair Inners Stop Time Repair Inners Run Time
AOI Before Plating Start Time AOI Before Plating Stop Time
AOI Before Plating Run Time AOI Final Start Time
AOI Final Stop Time AOI Final Run Time
Repair Outers Start Time Repair Outers Stop Time
Repair Outers Run Time
Job Start Date Job End Date
Days to Complete
On-Time Delivery Ratio Ship Date
Original Milestones Process Milestones
Bake Time Date Ship Date